Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Carpenter, N and Bausman, D C (2016) Project Delivery Method Performance for Public School Construction: Design-Bid-Build versus CM at Risk. Journal of Construction Engineering and Management, 142(10).

Chang, C and Chen, S (2016) Transitional Public–Private Partnership Model in China: Contracting with Little Recourse to Contracts. Journal of Construction Engineering and Management, 142(10).

Chen, C, Wang, Q, Martek, I and Li, H (2016) International Market Selection Model for Large Chinese Contractors. Journal of Construction Engineering and Management, 142(10).

Choi, J O, O’Connor, J T and Kim, T W (2016) Recipes for Cost and Schedule Successes in Industrial Modular Projects: Qualitative Comparative Analysis. Journal of Construction Engineering and Management, 142(10).

Choi, K and Lee, H W (2016) Deconstructing the Construction Industry: A Spatiotemporal Clustering Approach to Profitability Modeling. Journal of Construction Engineering and Management, 142(10).

de Castro e Silva Neto, D, Cruz, C O, Rodrigues, F and Silva, P (2016) Bibliometric Analysis of PPP and PFI Literature: Overview of 25 Years of Research. Journal of Construction Engineering and Management, 142(10).

  • Type: Journal Article
  • Keywords: Bibliometric analysis; Literature review; Public-private partnership (PPP); Project finance initiative (PFI); Contracting;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001163
  • Abstract:
    Academics have been devoting a growing attention to different matters involving public-private partnerships (PPPs), and, as the use of PPPs for delivering infrastructure evolves worldwide, so does the number and type of papers addressing this procurement model. The objective of this paper is to undertake a comprehensive literature review of papers relating to PPPs and private finance initiatives (PFIs), using a bibliometric analysis. More than 600 papers published between 1990 and 2014 were examined. None of the previously existing studies analyzed such a large sample of papers. The research found that PPP studies appear to have a steady momentum toward growth. Engineering journals (and engineering as a research area) have been particularly active in this field. Authors based in Europe and Asia had written almost two-thirds of the papers, with transportation and health sectors at the top of sector-based papers. Most of the existing work is focused on aspects of contract design, risk sharing, and analyzing the contract performance and benefits, and neglects areas such as contract termination and renegotiation. The management of PPPs will be the next big challenge for PPP scholars and professionals.

Duzkale, A K and Lucko, G (2016) Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: I. Conceptual Framework and Qualitative C-I-V-I-L Classification. Journal of Construction Engineering and Management, 142(10).

Duzkale, A K and Lucko, G (2016) Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: II. Comparative Analysis and Quantitative C-I-V-I-L Classification. Journal of Construction Engineering and Management, 142(10).

Gwak, H, Son, S, Park, Y and Lee, D (2016) Exact Time–Cost Tradeoff Analysis in Concurrency-Based Scheduling. Journal of Construction Engineering and Management, 142(10).

Harper, C M, Molenaar, K R and Cannon, J P (2016) Measuring Constructs of Relational Contracting in Construction Projects: The Owner’s Perspective. Journal of Construction Engineering and Management, 142(10).

Moret, Y and Einstein, H H (2016) Construction Cost and Duration Uncertainty Model: Application to High-Speed Rail Line Project. Journal of Construction Engineering and Management, 142(10).

Namian, M, Albert, A, Zuluaga, C M and Jaselskis, E J (2016) Improving Hazard-Recognition Performance and Safety Training Outcomes: Integrating Strategies for Training Transfer. Journal of Construction Engineering and Management, 142(10).

Poshdar, M, González, V A, Raftery, G M, Orozco, F, Romeo, J S and Forcael, E (2016) A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules. Journal of Construction Engineering and Management, 142(10).

Ramaji, I J and Memari, A M (2016) Product Architecture Model for Multistory Modular Buildings. Journal of Construction Engineering and Management, 142(10).

Salas, R and Hallowell, M (2016) Predictive Validity of Safety Leading Indicators: Empirical Assessment in the Oil and Gas Sector. Journal of Construction Engineering and Management, 142(10).

Sveikauskas, L, Rowe, S, Mildenberger, J, Price, J and Young, A (2016) Productivity Growth in Construction. Journal of Construction Engineering and Management, 142(10).